TRANSFER CASE ASSEMBLY – Install and Overhaul – 2500 HD,3500,Diesel
CHECK POWER/ GROUNDS AND WIRING HARNESS
MAIN CONTROL VALVE BODY – Remove and Replace – All Applicable Models – [Includes: Perform Tech2 "FastLearn" procedure. Includes: Confirm Fluid temperature for level check.]
MAIN CONTROL VALVE BODY – Clean and Inspect (Removed)
TRANSMISSION ASSEMBLY – Removal and Installation – Diesel,4WD – [Includes: Confirm Fluid temperature for level check.]
JACOB L. gave our service a 5 star review on 4/7/2018